The goal of this project was to restore natural flow and function to Belville Creek in Cofrin Nature Park. ETS developed a site-specific safety plan, and construction occurred without disrupting park operations.
Creek Restoration and Slope Stabilization
The scope included grading and stabilizing undercut and unstable creek banks; removing CMP pipe and associated structures that interfered with the creek’s natural function; removing objectionable materials from the banks and creek bed; installing a prefabricated pedestrian bridge; restoring creek bed elevations; and installing grasses, trees, and other native vegetation to stabilize the creek banks.