This project involved the restoration of the Cone Development Borrow Pits on SWFWMD’s Serenova Preserve. A site-specific safety plan was developed for this project and the scope of work included debris handling and debris recycling/removal, excavation, on-site and off disposal, spoil overburden grading and leveling, pond site slope grading, soil and road stabilization, plant material procurement, upland and wetlands planting, and the installation of two water-filled borrow areas, referred to as North and South Pits.
This project involved the restoration of the Cone Development Borrow Pits on SWFWMD’s Serenova Preserve. A site-specific safety plan was developed for this project and the scope of work included debris handling and debris recycling/removal, excavation, on-site and off disposal, spoil overburden grading and leveling, pond site slope grading, soil and road stabilization, plant material procurement, upland and wetlands planting, and the installation of two water-filled borrow areas, referred to as North and South Pits.