This project involved remediating issues impacting the operation of the Nubbin Slough Stormwater Treatment Area. The scope included correcting deficiencies in two perimeter levees by raising the berms; excavating undesirable material in the ditches and placing geotextile fabric and filter sand; installing culverts; and sodding the side slopes.
This project involved remediating issues impacting the operation of the Nubbin Slough Stormwater Treatment Area. The scope included correcting deficiencies in two perimeter levees by raising the berms; excavating undesirable material in the ditches and placing geotextile fabric and filter sand; installing culverts; and sodding the side slopes.
Additionally, ETS removed old stilling wells and installed new stilling wells. The project also involved constructing an access ramp and staging area to allow District parking and access to the levees from the South as well as permanent fencing.